Factory Production Stages & Workflows

Production stages

The manufacturing steps for our three product families; designs differ within each family.

Made in Fayoum, EgyptB2B Wholesale & Brand SupplyManufacturing Since 2015

Step-by-Step Production Stages

Manufacturing flow from raw polymer formulation to final inspection and carton dispatch

Sole Component

PVC Soles

Prepare and thoroughly mix the material, load it into the machine, pour it into moulds, remove the soles, trim excess material, then bag them.

PVC Soles
01Stage 1

Raw Material Formulation

PVC polymers and additives are mixed to exact ratios ensuring flexibility and wear resistance.

02Stage 2

Machine Feeding & Mould Pouring

Material is injected into precision moulds under monitored thermal conditions.

03Stage 3

De-moulding & Flash Trimming

Soles are ejected from moulds and trimmed cleanly of any residual flash.

04Stage 4

Bagging & Wholesale Staging

Finished soles are bagged, batch-labelled, and staged for dispatch to shoe manufacturers.

Sole Component

Polyurethane Soles

Prepare and thoroughly mix the material, load it into the machine, pour it into moulds, remove the soles and trim excess material, then spray and bag them.

Polyurethane Soles
01Stage 1

Chemical Formulation & Density Setup

Polyol and isocyanate components are blended for ultra-lightweight shock absorption.

02Stage 2

Precision Mould Injection

The reactive compound is poured into temperature-controlled mould stations.

03Stage 3

De-moulding & Trimming

Soles cure rapidly, are carefully removed, and trimmed to refined contours.

04Stage 4

Surface Spray & Color Coating

Soles enter the dedicated spray line for durable colour and protective surface finish.

05Stage 5

Bagging & Logistics Batching

Each batch is verified for finish consistency, packaged in protective bags, and boxed.

Finished Product

Injection-moulded slippers

Cut the leather for the selected model, assemble the upper (fondi), fit it to the machine, inject the material into the moulds, trim excess material, then pack the slippers.

Injection-moulded slippers
01Stage 1

Pattern Cutting of Upper Leather

Selected leather or synthetic material is precision cut to model specifications.

02Stage 2

Upper (Fondi) Assembly & Stitching

Upper sections are stitched, lined, and shaped to form the pre-assembled fondi.

03Stage 3

Machine Mounting & Direct Injection

Fondi is fitted onto machine lasts; sole material is injected directly, fusing upper and sole.

04Stage 4

Flash Trimming & Quality Check

Post-cooling trim removes edge flash, followed by seam and bond strength verification.

05Stage 5

Carton Boxing & Wholesale Staging

Slippers are paired, boxed into cartons, and prepared for commercial dispatch.

B2B Wholesale & Supply

Ready to discuss wholesale supply or manufacture your design?

Contact the factory sales and engineering team for a confirmed Quotation or to arrange Technical Review.